Veröffentlicht als:
- Kurzergebnis
- wa-ID
- wa-2014235
- Tag der Veröffentlichung
- 01.06.2016
- Aktualisiert am
- 01.06.2016
- Verfahrensart
- Offener Wettbewerb
- Zulassungsbereich
-
EU /EWR
- Beteiligung
- 26 Arbeiten
- Auslober
- FC Barcelona
- Preisgerichtssitzung
- 08.03.2016
Verfahrensart
Offener, zweiphasiger Wettbewerb
Competition assignment
Nou Camp Nou (approx.105.000 capacity)
- Comprehensive renovation of Camp Nou retaining existing structure without exceeding 130.000 m2
- Demolition & new construction of Tier 1 incorporating skyboxes at the back of Tier 1
- Renovation of Tier 2 including removal of “Fila O” & positioning of press area at the back of Tribuna
- Completion of Tier 3 behind goals & Tribuna
- Insertion of VIP seating & complementary hospitality spaces without compromising Socio’s seats
- Construction of new, exterior perimeter platform “Ameba” to facilitate horizontal circulation around the stadium and improve ingress and egress
- New museum under Ameba Tribuna side
- New Nike Store under Ameba Tribuna side
- New façade including new vertical circulation
- New, cable net roof providing 100% seat coverage including demolition of “Marquesina”
- Construction while maintaining uninterrupted, hosting of football matches without lowering capacity under approx. 80.000
Offener, zweiphasiger Wettbewerb
Competition assignment
Nou Camp Nou (approx.105.000 capacity)
- Comprehensive renovation of Camp Nou retaining existing structure without exceeding 130.000 m2
- Demolition & new construction of Tier 1 incorporating skyboxes at the back of Tier 1
- Renovation of Tier 2 including removal of “Fila O” & positioning of press area at the back of Tribuna
- Completion of Tier 3 behind goals & Tribuna
- Insertion of VIP seating & complementary hospitality spaces without compromising Socio’s seats
- Construction of new, exterior perimeter platform “Ameba” to facilitate horizontal circulation around the stadium and improve ingress and egress
- New museum under Ameba Tribuna side
- New Nike Store under Ameba Tribuna side
- New façade including new vertical circulation
- New, cable net roof providing 100% seat coverage including demolition of “Marquesina”
- Construction while maintaining uninterrupted, hosting of football matches without lowering capacity under approx. 80.000